Spring has arrived near Piaseczno, and in the Wille przy Lesie estate, you can see more and more changes every day. This is a development created from the very beginning for those who seek more – space, privacy, and closeness to nature. Let’s take a look at what is currently happening on the construction site.
A few words about Wille przy Lesie
The estate of single-family houses is being developed on the border of Piaseczno and Jazgarzewszczyzna – in a quiet, green area. It is a place that offers real breathing space after a day in the city, while still allowing for comfortable everyday living.
Wille przy Lesie consists of intimate premium homes. Semi-detached single-family housing ensures maximum privacy – fewer neighbors behind the wall and a garden surrounding the house.
What sets this estate apart from our other homes for sale includes rooftop terraces. In the attic, there is a large room with direct access to a terrace offering beautiful views. Additionally, there is an eco-friendly heat pump to help optimize heating costs, and two parking spaces right by the entrance. Wille przy Lesie is a response to higher needs and expectations.
What is the construction progress like near Piaseczno?
Construction has resumed at full speed, and each stage of the project is at a different level of advancement. What exactly is happening on site today?
– In stage two (buildings 1–4), facade works are underway. On the upper floors, we are completing rooftop terrace insulation, while inside the houses we are plastering walls, laying floor layers, and installing underfloor heating.
– In stage one (buildings 5–9), we have completed the structural construction along with roof trusses and partition walls. We are now preparing for roofing as well as window and door installation. Electrical installations will also begin soon.
– In stage three (buildings 10–14), we are at the beginning of structural works. Most of the foundation slabs have already been poured, and we are currently building ground floor walls and preparing the first floor slab.
– Across the entire estate, we have already completed the access road from Krzywa Street and installed rainwater tanks. A large part of the sanitary and stormwater drainage system is ready, and we are now starting work on the water supply and power networks.
Everything is progressing according to schedule, and the coming weeks will bring even more visible results.